Suzhou Electric Appliance Research Institute
期刊號: CN32-1800/TM| ISSN1007-3175

Article retrieval

文章檢索

首頁 >> 文章檢索 >> 往年索引

核電廠中壓電氣貫穿件短路電動力試驗探討

來源:電工電氣發(fā)布時間:2017-06-20 10:20 瀏覽次數(shù):8
核電廠中壓電氣貫穿件短路電動力試驗探討
 
鄭開云
(上海發(fā)電設備成套設計研究院,上海 200240)
 
    摘 要:核電廠中壓電氣貫穿件為安全殼內(nèi)反應堆冷卻劑泵電機提供三相交流電源,設備設計和鑒定中應考慮可能發(fā)生的單相、兩相和三相短路故障。根據(jù)中壓電氣貫穿件的結構特點和相關鑒定標準,對比分析了中壓電氣貫穿件可能發(fā)生的兩相和三相短路的電動力,并探討了短路電動力試驗方法。分析結果表明:中壓電氣貫穿件發(fā)生三相短路的電動力較大,中壓電氣貫穿件應進行三相短路試驗;短路試驗電路的X /R 值和合閘相角對于短路電動力都有影響;在進行短路試驗時應調(diào)整試驗電路參數(shù),確保至少其中某一相導體的短路電流達到最大短路電流峰值,從而使電動力達到預期目標值。
    關鍵詞:核電廠;中壓電氣貫穿件;電動力;短路試驗
    中圖分類號:TM623          文獻標識碼:A         文章編號:1007-3175(2017)06-0051-04
 
Discussion on Short-Circuit Electromotive Force Testing of Medium-Voltage
Electric Penetration Assembly in Nuclear Power Plant
 
ZHENG Kai-yun
(Shanghai Power Equipment Research Institute, Shanghai 200240, China)
 
    Abstract: The medium-voltage electric penetration assembly in nuclear power plant provides three-phase AC power source for the reactor coolant pump dynamo inside the containment. In the design and appraisal of equipment, consideration should be made for the possible happened one-phase, two-phase and three-phase short-circuit faults. According to the structure feature of medium-voltage electric penetration assembly and the related appraisal standard, this paper compared and analyzed the two-phase and three-phase short-circuit electromotive forces possibly happened in medium-voltage electric penetration assembly and probed the testing method. The analysis result shows that the electromotive forces of three-phase short-circuit are larger in medium-voltage electric penetration assembly. The medium-voltage electric penetration assembly should be subjected to three-phase short-circuit test. The X/R value of short-circuit testing circuit and the closing phase angle have effects on the short-circuit electromotive force. The testing circuit parameters should be adjusted before short-circuit testing, so as to make sure that at least one phase reaches the peek short-circuit current and then the electromotive forces reach the expected target value.
    Key words: nuclear power plant; medium-voltage electric penetration assembly; electromotive force; short-circuit testing
 
參考文獻
[1] IEEE Std 317-2013 IEEE Standard for Electric Penetration Assembliesin Containment Structures for Nuclear Power Generating Stations[S].
[2] IEEE Std C37.09-1999 IEEE Standard Test Procedure for AC High-Voltage Circuit Breakers Rated on a Symmetrical Current Basis[S].