一起500 kV氣體絕緣開關閃絡事故的處理分析

來源:電工電氣發(fā)布時間:2016-04-06 14:06 瀏覽次數(shù):15

一起500 kV氣體絕緣開關閃絡事故的處理分析 

王偉1,張彥2,曲文韜3

1 國網(wǎng)山東省電力公司經(jīng)濟技術研究院,山東 濟南 250021;2 國網(wǎng)技術學院,山東 濟南 250002;
3 國網(wǎng)山東省電力公司檢修公司,山東 濟南 250001
 
 

摘 要:介紹了一起500 kV氣體絕緣開關(GIS)設備的絕緣事故,分析了其應急處置及搶修方案,并通過對放電痕跡和物質的分析推測了事故原因,該事故是因設備裝備過程中殼體法蘭面和絕緣盆環(huán)氧樹脂面的間隙混入金屬異物,由于設備振動導致異物位置偏移引起電場變化,致使閃絡事故的發(fā)生。指出應嚴格現(xiàn)場施工質量管控,保證設備安裝質量,確保電網(wǎng)安全穩(wěn)定運行。
關鍵詞:氣體絕緣開關設備;閃絡;事故處理
中圖分類號:TM591;TM855 文獻標識碼:B 文章編號:1007-3175(2014)10-0034-03


Disposal and Analysis of 500 kV Gas Insulated Switchgear Flashover Accident 

WANG Wei1, ZHANG Yan2, QU Wen-tao3 
1 Shandong Electric Power Economic Research Institute, Jinan 250021, China; 
2 State Grid of China Technology College, Jinan 250002, China; 3 Shandong Electric Power Maintenance Company, Jinan 250001, China)
 
 

Abstract: Introduction was made to an insulation accident of 500 kV gas insulated switchgear (GIS) equipment. This paper analyzed its emergency disposal and strategy management and determined accident causes via discharge track and material analysis. The accident was due to metal foreign objects mixed into the clearance between casing flange and insulation basin epoxy during equipment installation process. The vibration of the equipment caused foreign object position displacement with electric field change and thus flashover accident took place. It is pointed out that construction on site should be with strict quality management and control, to ensure equipment installation quality and to guarantee power grid in safe and stable operation.
           Key words: gas insulated switchgear; flashover; accident disposal


參考文獻
[1] 羅學琛.SF6氣體絕緣全封閉組合電器(GIS)[M].北京:中國電力出版社,2009. 
[2] 王偉,馮新巖,曲文韜,等.超聲波法在GIS局部放電檢測中的應用[J].電氣技術,2010(7):38-41.
[3] 徐世山,孟可風,劉文泉.一起363 kV GIS充電閃絡故障的原因分析[J].高壓電器,2007,43(1):74-76.
[4] 楊振宇,何正興,俞澄一.晉陵變220kVGIS的漏氣檢修及其相關問題[J].高壓電器,2010,46(6):93-97.