烏昌地區(qū)短路電流分析及限制措施研究
張慧娥1,劉大貴2,秦艷輝2
1 新疆電力設(shè)計(jì)院,新疆 烏魯木齊 830011;2 新疆電力科學(xué)研究院,新疆 烏魯木齊 830001
摘 要:隨著電網(wǎng)的發(fā)展和大容量機(jī)組的接入,烏昌地區(qū)220kV系統(tǒng)短路容量已成為影響電網(wǎng)安全穩(wěn)定運(yùn)行的主要問(wèn)題。在采用高阻抗變壓器、分層分區(qū)等限流措施基礎(chǔ)上,根據(jù)不同階段的網(wǎng)架特點(diǎn),進(jìn)一步采取開(kāi)斷線路、加裝串聯(lián)電抗器、更換開(kāi)關(guān)等方法來(lái)有效限制短路電流水平,并結(jié)合該地區(qū)自身特點(diǎn)給出了具體的實(shí)施方案。
關(guān)鍵詞:短路電流;限制措施;開(kāi)斷線路;串聯(lián)電抗器
中圖分類(lèi)號(hào):TM713 文獻(xiàn)標(biāo)識(shí)碼:B 文章編號(hào):1007-3175(2013)12-0038-03
Short Circuit Current Analysis and Restrictive Measure Research in Urumuqi-Changji Area
ZHANG Hui-e1, LIU Da-gui2, QIN Yan-hui2
1 Xinjiang Electric Power Design Institute, Urumuqi 830011, China;
2 Xinjiang Electric Power Science and Research Institute, Urumuqi 830001, China
Abstract: Following development of power grid and large capacity machine units connected-in Urmuqi-Changji area, 220kV system short circuit capacity has become a main problem of impact on power grid safety and stability of operation. On the basis of adopting high-impedance transformers, layer making and zone making etc current restrictive measures, according to grid frame characteristics of different stages, the methods including breaking lines, installing series reactors, changing switchgears etc. were adopted further to effectively restrict short circuit current level. Combined with the area itself features, this paper gave the concrete implementation plan .
Key words: short circuit current; restrictive measure; breaking line; series reactor
參考文獻(xiàn)
[1] 呂文杰.英國(guó)國(guó)家電網(wǎng)的短路電流控制技術(shù)[J].華東電力,2005,33(9):22-24.
[2] J Amon F, P C Fernandez, E H Rose, A D'Ajuz, A Castanheira.巴西在將限流電抗器用于短路電流限制方面取得的成功經(jīng)驗(yàn)[J].電氣應(yīng)用,2006,24(1):4-8.
[3] 袁娟,劉文穎,董朋齊,等.西北電網(wǎng)短路電流的限制措施[J].電網(wǎng)技術(shù),2007,31(10):12-15.
[4] 阮前途.上海電網(wǎng)短路電流控制的現(xiàn)狀與對(duì)策[J].電網(wǎng)技術(shù),2005,29(2):78-83.
[5] 陳怡靜.大電網(wǎng)短路電流限制措施研究[D].杭州:浙江大學(xué),2008.
[6] 于會(huì)泉.電網(wǎng)短路電流限制措施的優(yōu)化配置研究[D].吉林:東北電力大學(xué),2011.