1 100 kV GIS/GIL產品電氣試驗專用工裝的設計
吉小振,李華良,龐明明,吳耿博,景亞科
(中國啟源工程設計研究院有限公司,陜西 西安 710018)
摘 要:氣體絕緣開關設備 (GIS) 和氣體絕緣輸電線路 (GIL) 產品的出廠電氣試驗通常是在總裝車間內進行的,根據(jù)某 1 100 kV GIS/GIL 總裝車間電氣試驗需求,設計了滿足工頻耐壓試驗、局放試驗及沖擊試驗的專用工裝。采用六氟化硫(SF6)氣體絕緣試驗變壓器和沖擊發(fā)生器降低了廠房高度,節(jié)約了廠房建設投資;為確定工頻電源補償容量,計算了計及試驗工裝后的負載電容電流,還利用 ATP-EMTP 評估了 GIS/GIL 工裝電容、電阻和電感對雷電沖擊試驗波形參數(shù)的影響,可供相關的試驗技術人員參考。
關鍵詞:氣體絕緣開關設備;試驗工裝;局部放電;電氣試驗
中圖分類號:TM866 文獻標識碼:B 文章編號:1007-3175(2021)05-0059-05
Design of Special Tooling for Electrical Test of 1 100 kV GIS/GIL Products
JI Xiao-zhen, LI Hua-liang, PANG Ming-ming, WU Geng-bo, JING Ya-ke
(China Qiyuan Engineering Corporation, Xi'an 710018, China)
Abstract: The electrical test of GIS/GIL is usually carried out in assembly workshop. Due to product assembly, inflation and standing time is long and electrical test time is short. In order to improve test efficiency, the manufacturers usually adopt the technological process of assembling multiple products at the same time and then to conduct electrical test one by one. Therefore, the design of special electrical test apparatus is particularly important. According to the electrical test demand of an 1 100 kV GIS/GIL assembly workshop, the special test apparatus is designed to meet the demand of power frequency withstand voltage test, partial discharge test and impulse voltage test. The SF6 type test transformer and impulse voltage generator are used to reduce the height of workshop and save the construction investment. In order to determine the compensation capacity of power supply, the load capacitance current considering test apparatus is taken into account and calculated. In addition, ATP-EMTP is used to evaluate the influence of GIS/GIL capacitance, resistance and inductance on lightning impulse test waveform parameters, which can be referred by relevant test technicians.
Key words: gas insulated switchgear; test apparatus; partial discharge; electrical test
參考文獻
[1] 劉澤洪,王承玉,路書軍,等. 蘇通綜合管廊工程特高壓 GIL 關鍵技術要求[J]. 電網(wǎng)技術,2020,44(6) :2377-2385.
[2] 馬徑坦,張喬根,吳治誠,等. 直流疊加沖擊電壓對 GIS 中自由導電微粒檢測的有效性[J] . 高電壓技術,2019,45(3) :737-742.
[3] 班連庚,孫崗,項祖濤,等. 特高壓蘇通綜合管廊工程 GIL 系統(tǒng)工作條件[J] . 電網(wǎng)技術,2020,44(6) :2386-2393.
[4] 中國電器工業(yè)協(xié)會. 額定電壓 72.5 kV 及以上剛性氣體絕緣輸電線路:GB/T 22383—2017[S] . 北京:中國標準出版社,2017 :23.
[5] 中國電器工業(yè)協(xié)會. 額定電壓 72.5 kV 及以上氣體絕緣金屬封閉開關設備:GB 7674—2008[S]. 北京:中國標準出版社,2008 :29.
[6] 國家能源局. 氣體絕緣金屬封閉輸電線路技術條件:DL/T 978—2018[S] . 北京:中國電力出版社,2018 :28.
[7] 國家電網(wǎng)有限公司. 國家電網(wǎng)有限公司十八項電網(wǎng)重大反事故措施( 修訂版)[M]. 北京:中國電力出版社,2019.
[8] 黎斌.SF6 高壓電器設計[M]. 北京:機械工業(yè)出版社,2019.
[9] 鐘磊,申萌,李華良,等. 限制特高壓開關設備雷電沖擊過沖的試驗回路開發(fā)[J] . 高壓電器,2014,50(10) :20-24.