發(fā)電機(jī)裂相橫差保護(hù)報(bào)警分析與處理
陳熙平,張杰,張強(qiáng)
(雅礱江流域水電開發(fā)有限公司,四川 成都 610056)
摘 要:介紹了發(fā)電機(jī)裂相橫差保護(hù)報(bào)警現(xiàn)場(chǎng)檢查方法,分析了裂相橫差保護(hù)報(bào)警原因,確認(rèn)報(bào)警原因?yàn)榘l(fā)電機(jī)中性點(diǎn)電流互感器(CT)故障。對(duì)CT故障原因進(jìn)行分析可知,是運(yùn)行環(huán)境溫度長(zhǎng)期過(guò)高,CT絕緣等級(jí)不夠,且設(shè)備本身存在質(zhì)量問(wèn)題等因素造成。對(duì)該故障提出了現(xiàn)場(chǎng)改善措施,運(yùn)行實(shí)踐表明,該改善措施效果明顯。
關(guān)鍵詞:中性點(diǎn)電流互感器(CT);裂相橫差;保護(hù)報(bào)警;故障
中圖分類號(hào):TM312;TM452 文獻(xiàn)標(biāo)識(shí)碼:B 文章編號(hào):1007-3175(2020)12-0039-04
Analysis and Treatment of Generator Split-Phase Transverse Differential Protection Alarm
CHEN Xi-ping, ZHANG Jie, ZHANG Qiang
(Yalong River Hydropower Development Co.,Ltd, Chengdu 610056, China)
Abstract: This paper introduces the on-site inspection method of the generator split-phase transverse differential protection alarm, analyzes the cause of the alarm, and confirms that the cause of the alarm is the generator neutral current transformer (CT) fault. By analyzing the causes of CT fault, the operating environment temperature is too high for a long time, the CT insulation class is low, and the equipment itself has quality problems. The field improvement measures are put forward for the fault, and the operation practice shows that the improvement measures are effective.
Key words: neutral current transformer; split-phase transverse differential; protection alarm; fault
參考文獻(xiàn)
[1] 黃勇,周有慶,彭紅海,等. 電流互感器變比測(cè)量方法的研究[J]. 變壓器,2002,39(11):31-33.
[2] 姚春球. 發(fā)電廠電氣部分[M]. 北京:中國(guó)電力出版社,2007.
[3] 中華人民共和國(guó)電力工業(yè)部安全監(jiān)察及生產(chǎn)協(xié)調(diào)司,國(guó)家電力調(diào)度通信中心. 電力設(shè)備預(yù)防性試驗(yàn)規(guī)程:DL/T 596—1996[S]. 北京:中國(guó)電力出版社,1996:13.
[4] 中國(guó)電力企業(yè)聯(lián)合會(huì). 電氣裝置安裝工程 電氣設(shè)備交接試驗(yàn)標(biāo)準(zhǔn):GB 50150—2006[S]. 北京:中國(guó)計(jì)劃出版社,2006:33.