Suzhou Electric Appliance Research Institute
期刊號(hào): CN32-1800/TM| ISSN1007-3175

Article retrieval

文章檢索

首頁(yè) >> 文章檢索 >> 往年索引

新能源總承包工程項(xiàng)目調(diào)試管理研究

來(lái)源:電工電氣發(fā)布時(shí)間:2020-04-18 14:18 瀏覽次數(shù):983
新能源總承包工程項(xiàng)目調(diào)試管理研究
 
陸冉,袁龍威
(中國(guó)能源建設(shè)集團(tuán)江蘇省電力設(shè)計(jì)院有限公司,江蘇 南京 211102)
 
    摘 要:新能源成為我國(guó)電力的發(fā)展方向,站內(nèi)設(shè)備調(diào)試及涉外設(shè)備調(diào)試是重要的一個(gè)環(huán)節(jié),通過(guò)高壓試驗(yàn)、保護(hù)調(diào)試、回路的傳動(dòng),來(lái)保證受電前設(shè)備及施工的質(zhì)量。結(jié)合已開(kāi)展的新能源總承包項(xiàng)目,基于新能源電站并網(wǎng)拓?fù)浣Y(jié)構(gòu),針對(duì)調(diào)試范圍進(jìn)行劃分,討論了如何運(yùn)用項(xiàng)目管理手段實(shí)現(xiàn)對(duì)調(diào)試環(huán)節(jié)的“質(zhì)量、成本、進(jìn)度“三要素管理,來(lái)有效提升調(diào)試管理質(zhì)量。
    關(guān)鍵詞:新能源;調(diào)試;項(xiàng)目管理;三要素管理
    中圖分類號(hào):TM61;TM734     文獻(xiàn)標(biāo)識(shí)碼:A     文章編號(hào):1007-3175(2020)04-0064-04
 
Research on Commissioning Management of New Energy General Contracting Projects
 
LU Ran, YUAN Long-wei
(China Energy Engineering Group Jiangsu Power Design Institute Co., Ltd, Nanjing 2111 02, China)
 
    Abstract: New energy has become the development direction of electric power in China. The station equipment debugging and the foreign-related equipment debugging are the most important links. The quality of equipment and construction before electricity was ensured through the high-pressure test, the protection debugging and the loop transmission. Combining with the new energy general contracting project carried out by our hospital, based on the grid connection topological structure of the new energy power station and aiming at the debugging range division, this paper discussed how to use project management means to realize the “quality, cost and schedule” management to effectively promote the quality of debugging management.
    Key words: new energy; debugging; project management; three elements management
 
參考文獻(xiàn)
[1] 任鐘淳,蕭能意,韓濤. 電力工程項(xiàng)目管理的模式探討[J]. 中國(guó)勘察設(shè)計(jì),2003(4):33-38.
[2] 關(guān)宇, 廖麗貞, 董哲, 等. 新能源升壓站監(jiān)控系統(tǒng)調(diào)試方法研究[J]. 自動(dòng)化應(yīng)用,2017(5):141-142.
[3] 胡巖,賈冰. 電力工程項(xiàng)目管理的三要素分析[J].東北電力大學(xué)學(xué)報(bào),2008,28(3):1-3.
[4] 閆培麗,袁兆祥,齊立忠,等. 海上風(fēng)電場(chǎng)二次系統(tǒng)設(shè)計(jì)關(guān)鍵技術(shù)[J]. 電力建設(shè),2015,36(4):129-133.
[5] 張哲. 東海大橋100 MW海上風(fēng)電場(chǎng)電氣系統(tǒng)的設(shè)計(jì)[J]. 電力與能源,2012,33(1):49-51.
[6] 楊明,宋曉兵. 風(fēng)電場(chǎng)升壓站電氣設(shè)備安裝調(diào)試管理[J]. 云南水力發(fā)電,2016,32(4):22-24.
[7] 張馳. 風(fēng)電場(chǎng)升壓站電氣設(shè)備安裝與調(diào)試探究[J].科技風(fēng),2018(4):163.
[8] 尹佳林. 風(fēng)力發(fā)電廠設(shè)備調(diào)試過(guò)程管理現(xiàn)狀與問(wèn)題[J]. 黑龍江科技信息,2011(27):65.
[9] 何建軍,趙飛,馮磊華,等. 基于WMCS的大型風(fēng)電場(chǎng)群遠(yuǎn)程監(jiān)控系統(tǒng)協(xié)調(diào)運(yùn)行調(diào)試研究[J]. 風(fēng)能,2016(10):58-61.